Project Photos

This page is intended to provide monthly photo updates of certain construction activities occurring with the project.
Residents are encouraged to check this project website page for regular photo updates.

June 2020 Photos

Boring into to make pathway for pipe

July 2020 Photos

Long length of piping
Long length of piping
Long length of piping
Long length of piping
Long length of piping

August 2020 Photos

Long length of piping

October 2020 Photos

Preparing to fuse the 30-inch HDPE pipe at 10th Street
Installing 42-inch reamer at 4th Street

November 2020 Photos

30 IN HDPE PIPE (3,400 FT)

30-Inch HDPE Pipe (3,400 ft) Staged on Osprey Ave. and Ready for Installation (6PM – 10/28/20)

30 IN HDPE PIPE STRING

30-Inch HDPE Pipe String Entering Bore Hole at 4t Street (8AM – 10/29/20)

30-Inch HDPE Pipe String (3,400 ft.) Exiting Bore Hole

30-Inch HDPE Pipe String (3,400 ft.) Exiting Bore Hole at Brother Geenan (3PM – 10/30/20) w/Accurate Drilling Systems Owner and Crew Working to Complete the Drill

Horizontal Directional Drill of 30 in

Horizontal Directional Drill of 30-Inch HDPE Pipe String (3,400 ft.) Complete (5PM – 10/30/20) After 33 Hours of Continuous Work

December 2020 Photos

Not available at this time.

January 2021 Photos

Not available at this time.

January 2021 Photos

Not available at this time.

February 2021 Photos

Not available at this time.

March 2021 Photos

Not available at this time.

April 2021 Photos

Not available at this time.

May 2021 Photos

Not available at this time.

June 2021 Photos

Not available at this time.

July 2021 Photos

Not available at this time.

August 2021 Photos

Not available at this time.

September 2021 Photos

Not available at this time.

October 2021 Photos

Not available at this time.

November 2021 Photos

Not available at this time.